{"id":26150,"date":"2026-02-14T14:09:54","date_gmt":"2026-02-14T14:09:54","guid":{"rendered":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/exigasoftware.com.sg\/?p=26150"},"modified":"2026-04-26T06:21:49","modified_gmt":"2026-04-26T06:21:49","slug":"scaffold-inspection-form","status":"publish","type":"post","link":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/exigasoftware.com.sg\/scaffold-inspection-form\/","title":{"rendered":"Scaffold Inspection Form"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"26150\" class=\"elementor elementor-26150\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2bb7b4a e-flex e-con-boxed e-con e-parent\" data-id=\"2bb7b4a\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-398d8a9 elementor-widget elementor-widget-text-editor\" data-id=\"398d8a9\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h3 dir=\"auto\">Exiga Digital Scaffold Inspection Form<\/h3>\n<p dir=\"auto\"><strong>Paperless. Photo-Proof. Audit-Ready.<\/strong><\/p>\n<p dir=\"auto\"><b><a href=\"https:\/\/glutenfreepleasure.com\/__proxy_domain\/exigasoftware.com.sg\/\">Scaffold Inspection Form<\/a><\/b><span data-start=\"201\" data-end=\"229\">&nbsp;<\/span>Replace handwritten tags and clipboards with a guided, mobile-first digital inspection form that ensures every scaffold check is thorough, compliant, and instantly documented. Built for competent persons\/inspectors, the form captures real-time data, flags issues, attaches evidence, and generates compliant reports \u2014 all synced to the cloud.<\/p>\n<p dir=\"auto\"><strong>Why Teams Choose Exiga&#8217;s Inspection Form<\/strong><\/p>\n<ul dir=\"auto\">\n<li>Guided step-by-step flow reduces missed items<\/li>\n<li>Mandatory fields + conditional logic (e.g., require photos on &#8220;Fail&#8221;)<\/li>\n<li>Offline support + auto-sync<\/li>\n<li>Built-in standards compliance (OSHA, HSE UK, EN, CISRS\/TG20)<\/li>\n<li>Digital signature + timestamp + GPS for full traceability<\/li>\n<li>One-tap status: <strong>Green<\/strong> (Safe\/Compliant), <strong>Yellow<\/strong> (Caution \u2013 Rectify), <strong>Red<\/strong> (Unsafe \u2013 Prohibit Use)<\/li>\n<\/ul>\n<h3 dir=\"auto\">Core Features of the Scaffold Inspection Form<\/h3>\n<ul dir=\"auto\">\n<li><strong>Scaffold Details Header<\/strong> Scaffold ID \/ QR scan, Location (GPS\/map pin), Type (tube &amp; fitting, system, suspended, mobile tower), Height, Load class, Erection date, Last inspection date<\/li>\n<li><strong>Inspector Info<\/strong> Inspector name (dropdown from team), Competency level (e.g., CISRS Basic\/Advanced), Date\/Time (auto), Digital signature<\/li>\n<li><strong>Guided Checklist<\/strong> Yes\/No\/NA + severity (Minor\/Major\/Critical) + mandatory photo\/voice note on No\/NA Customizable \u2014 add\/remove items, set mandatory for specific standards<\/li>\n<li><strong>Defect &amp; Action Section<\/strong> Auto-create tasks for fails \u2192 assign responsible person \u2192 due date \u2192 before\/after photos \u2192 close-out verification<\/li>\n<li><strong>Final Status &amp; Comments<\/strong> Overall status selector (Green\/Yellow\/Red) General notes, weather conditions, post-event trigger reason<\/li>\n<li><strong>Form Actions<\/strong> Submit \u2192 auto-generate PDF report Tag update (digital tag color change) Overdue alert if not completed on schedule<\/li>\n<\/ul>\n<h3 dir=\"auto\">Comprehensive Scaffold Inspection Checklist Template<\/h3>\n<p dir=\"auto\">(Pre-built in Exiga \u2013 fully editable\/customizable)<\/p>\n<p dir=\"auto\"><strong>1. Foundation &amp; Base<\/strong><\/p>\n<ul dir=\"auto\">\n<li>Firm, level ground\/sills\/mud sills in place and adequate size?<\/li>\n<li>Base plates\/screw jacks in firm contact with sills\/frames?<\/li>\n<li>Scaffold legs\/base on sound footing (no soft\/muddy\/frozen ground)?<\/li>\n<li>Wheels\/castors locked (if mobile)?<\/li>\n<li>Scaffold level\/plumb\/square?<\/li>\n<\/ul>\n<p dir=\"auto\"><strong>2. Structure &amp; Frame<\/strong><\/p>\n<ul dir=\"auto\">\n<li>Standards\/frames vertical\/plumb, no bends\/cracks\/damage\/rust?<\/li>\n<li>Ledgers\/transoms\/braces secure, properly spaced, no loose fittings?<\/li>\n<li>All connections pinned\/locked\/coupler tight?<\/li>\n<li>Cross bracing installed on all faces\/levels?<\/li>\n<li>Ties\/anchors\/guying sufficient and correctly positioned?<\/li>\n<\/ul>\n<p dir=\"auto\"><strong>3. Platforms &amp; Decking<\/strong><\/p>\n<ul dir=\"auto\">\n<li>Fully planked\/decked front-to-back\/side-to-side?<\/li>\n<li>No gaps &gt;1 inch (25mm)?<\/li>\n<li>Scaffold-grade planks\/boards, no splits\/protruding nails\/sharp edges?<\/li>\n<li>Planks extend 6\u201312 inches over supports, secure against movement?<\/li>\n<li>Platforms free of debris, mud, oil, ice, tripping hazards?<\/li>\n<\/ul>\n<p dir=\"auto\"><strong>4. Guardrails, Midrails &amp; Toeboards<\/strong><\/p>\n<ul dir=\"auto\">\n<li>Guardrails on all open sides\/ends (top rail 38\u201345&#8243; \/ 950\u20131200mm high)?<\/li>\n<li>Midrails installed midway?<\/li>\n<li>Toeboards (min 4&#8243; \/ 150mm) in place where falling objects risk?<\/li>\n<li>Guardrail posts secure, no gaps?<\/li>\n<\/ul>\n<p dir=\"auto\"><strong>5. Access &amp; Egress<\/strong><\/p>\n<ul dir=\"auto\">\n<li>Safe ladders\/stairs provided and secured?<\/li>\n<li>No climbing on cross-braces\/frames?<\/li>\n<li>Access points unobstructed?<\/li>\n<li>Ladders extend 3 ft (1m) above landing?<\/li>\n<\/ul>\n<p dir=\"auto\"><strong>6. Fall &amp; Falling Object Protection<\/strong><\/p>\n<ul dir=\"auto\">\n<li>Fall protection (guardrails or PFAS) for heights &gt;10 ft (3m)?<\/li>\n<li>Falling object protection (toeboards, nets, canopies) where required?<\/li>\n<li>Distance to power lines safe (min 10 ft \/ 3m clearance)?<\/li>\n<\/ul>\n<p dir=\"auto\"><strong>7. Load &amp; Signage<\/strong><\/p>\n<ul dir=\"auto\">\n<li>Load rating not exceeded?<\/li>\n<li>Load class signage visible?<\/li>\n<li>No overloading (tools\/materials secured)?<\/li>\n<\/ul>\n<p dir=\"auto\"><strong>8. General &amp; Post-Event<\/strong><\/p>\n<ul dir=\"auto\">\n<li>Inspection tag\/digital status current and visible?<\/li>\n<li>No modifications without approval?<\/li>\n<li>Post-weather\/event: No damage from wind\/rain\/impact?<\/li>\n<li>Electrical hazards cleared?<\/li>\n<\/ul>\n<p dir=\"auto\"><strong>9. Final Verification<\/strong><\/p>\n<ul dir=\"auto\">\n<li>All defects rectified or scaffold tagged unsafe?<\/li>\n<li>Inspected by competent person?<\/li>\n<li>Ready for use?<\/li>\n<\/ul>\n<h3 dir=\"auto\">Integration &amp; Output<\/h3>\n<ul dir=\"auto\">\n<li><strong>Mobile App<\/strong>: Fill form offline, attach photos\/voice, submit\/sync<\/li>\n<li><strong>Cloud Dashboard<\/strong>: View submitted forms, filter by status\/site\/date<\/li>\n<li><strong>Reporting<\/strong>: Auto-PDF with embedded photos, signatures, charts \u2014 branded for clients\/HSE audits<\/li>\n<li><strong>Compliance Notes<\/strong>: Supports 7-day HSE UK statutory, daily OSHA pre-shift, post-event triggers<\/li>\n<\/ul>\n<p dir=\"auto\">This form helps ensure zero tolerance for overlooked hazards while slashing paperwork time.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Exiga Digital Scaffold Inspection Form Paperless. Photo-Proof. Audit-Ready. Scaffold Inspection Form&nbsp;Replace handwritten tags and clipboards with a guided, mobile-first digital inspection form that ensures every scaffold check is thorough, compliant, and instantly documented. Built for competent persons\/inspectors, the form captures real-time data, flags issues, attaches evidence, and generates compliant reports \u2014 all synced to the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":26151,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[155],"tags":[],"class_list":["post-26150","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-scaffold"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/exigasoftware.com.sg\/wp-json\/wp\/v2\/posts\/26150","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/exigasoftware.com.sg\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/exigasoftware.com.sg\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/exigasoftware.com.sg\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/exigasoftware.com.sg\/wp-json\/wp\/v2\/comments?post=26150"}],"version-history":[{"count":10,"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/exigasoftware.com.sg\/wp-json\/wp\/v2\/posts\/26150\/revisions"}],"predecessor-version":[{"id":26573,"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/exigasoftware.com.sg\/wp-json\/wp\/v2\/posts\/26150\/revisions\/26573"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/exigasoftware.com.sg\/wp-json\/wp\/v2\/media\/26151"}],"wp:attachment":[{"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/exigasoftware.com.sg\/wp-json\/wp\/v2\/media?parent=26150"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/exigasoftware.com.sg\/wp-json\/wp\/v2\/categories?post=26150"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/exigasoftware.com.sg\/wp-json\/wp\/v2\/tags?post=26150"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}