{"id":2829,"date":"2019-06-30T15:44:08","date_gmt":"2019-06-30T07:44:08","guid":{"rendered":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/www.aceplp.com.sg\/?p=2829"},"modified":"2019-08-19T10:04:51","modified_gmt":"2019-08-19T02:04:51","slug":"bim-use-in-ppvc-construction","status":"publish","type":"post","link":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/www.aceplp.com.sg\/bim-use-in-ppvc-construction\/","title":{"rendered":"BIM use in PPVC construction"},"content":{"rendered":"<p>PPVC stands for Pre-fabricated Pre-finished Volumetric Construction. It is a process in which pre-built blocks are manufacturing in an off-site facility and transported to the construction site for assembly.<\/p><h2 class=\"wp-block-heading\">Why is PPVC construction beneficial to the sector?<\/h2><p>PPVC construction will be able to cut down up to 40% of\ncosts associated with a building project. This is because cost savings can be\nfound in the selection and standardisation of materials in the building of the pre-fabricated\nunits. Instead of relying on manual labor to build a structure from the ground\nup, construction firms can rely on machinery to fabricate the individual\nmodules.<\/p><p>Also, lean construction processes can be leveraged to reduce costs. Instead of holding onto PPVC modules that can take up a floor area of at <a href=\"https:\/\/www.youtube.com\/watch?v=F3CJEqEuekc\">least 24 square meters<\/a>, modules can be built just-in-time and delivered to the site for assembly. <\/p><h2 class=\"wp-block-heading\">How does BIM complement PPVC Construction?<\/h2><p><strong><span style=\"text-decoration: underline;\">Design Phase<\/span><\/strong><\/p><p>Clash-detection \u2013 A virtual BIM model will facilitate\ncollaboration between project stake-holders and allow better decision making\nbetween contractors.<\/p><p>For example, the design team is able to communicate hundreds\nof material selections to the respective sub-contractors to ensure that the\ndesign intent is fulfilled during the construction phase<\/p><p><strong><span style=\"text-decoration: underline;\">Construction Phase<\/span><\/strong><\/p><p>From the 3D BIM model, 2D shop drawings are generated for the fabrication of PPVC components by the respective contractors.<\/p><p>During the assembly process, the virtual model is used to ensure that no errors occur.<\/p><h2 class=\"wp-block-heading\">Impact on Future Careers<\/h2><p>With the <a href=\"https:\/\/www.channelnewsasia.com\/news\/singapore\/budget-2019-foreign-worker-quota-in-services-sector-to-be-cut-to-11252904\">reduction in foreign manpower quota<\/a> by the Singapore government, this represents an excellent career opportunity for Singaporeans. There will now be a greater need for local expertise in PPVC construction. The government is driving the adoption of Dfma (Design for Manufacturing and Assembly) in the construction industry in which PPVC compoenents are its building blocks.. In fact, the use of Dfma is now a <a href=\"https:\/\/www.bca.gov.sg\/BuildableDesign\/ppvc.html\">mandatory requirement<\/a> for all non-landed Government Land Sales sites.<\/p><p>Construction companies can no longer rely on sheer physical\nmanpower but will also have to rely on manufacturing processes to get the job\ndone. There is now a greater need than ever for Architects, Civil &amp;\nStructural Engineers, and M&amp;E engineers&nbsp;\nto think how their jobs will have implications on each other.<\/p>","protected":false},"excerpt":{"rendered":"<p>PPVC stands for Pre-fabricated Pre-finished Volumetric Construction. It is a process in which pre-built blocks are manufacturing in an off-site facility and transported to the construction site for assembly. Why is PPVC construction beneficial to the sector? PPVC construction will be able to cut down up to 40% of costs associated with a building project. &#8230; <a title=\"BIM use in PPVC construction\" class=\"read-more\" href=\"https:\/\/glutenfreepleasure.com\/__proxy_domain\/www.aceplp.com.sg\/bim-use-in-ppvc-construction\/\" aria-label=\"More on BIM use in PPVC construction\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":3666,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/www.aceplp.com.sg\/wp-json\/wp\/v2\/posts\/2829"}],"collection":[{"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/www.aceplp.com.sg\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/www.aceplp.com.sg\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/www.aceplp.com.sg\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/www.aceplp.com.sg\/wp-json\/wp\/v2\/comments?post=2829"}],"version-history":[{"count":3,"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/www.aceplp.com.sg\/wp-json\/wp\/v2\/posts\/2829\/revisions"}],"predecessor-version":[{"id":2832,"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/www.aceplp.com.sg\/wp-json\/wp\/v2\/posts\/2829\/revisions\/2832"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/www.aceplp.com.sg\/wp-json\/wp\/v2\/media\/3666"}],"wp:attachment":[{"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/www.aceplp.com.sg\/wp-json\/wp\/v2\/media?parent=2829"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/www.aceplp.com.sg\/wp-json\/wp\/v2\/categories?post=2829"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/glutenfreepleasure.com\/__proxy_domain\/www.aceplp.com.sg\/wp-json\/wp\/v2\/tags?post=2829"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}