MPA completes 1,092-panel solar project at Marina South Pier
System can generate up to 780,000 kWh of electricity annually.
The Maritime and Port Authority of Singapore (MPA) has completed the installation of a solar energy system at Marina South Pier (MSP), adding 1,092 solar photovoltaic (PV) panels across about 3,200 square metres of rooftop and canopy space.
The system can generate up to 780,000 kWh of electricity annually, equivalent to the yearly electricity consumption of about 180 four-room HDB flats. It is expected to meet a significant portion of MSP’s electricity demand, with the terminal’s electrical systems to be progressively upgraded to optimise the use of renewable energy.
The solar installation will also support the current and future charging requirements of electric harbour craft operating at Marina South Pier.
MPA said the project will reduce greenhouse gas emissions from its shore-based operations and supports the public sector’s GreenGov.SG sustainability efforts.
The project is part of MPA’s wider efforts to expand renewable energy use across its shore-based facilities. MPA is also replacing diesel generators on Pulau Satumu with renewable electricity, with the island expected to be fully powered by renewable energy before the end of 2027.