Westlite wins $221.67m JTC dormitory tender at Lok Yang Way
The 5,000-bed site at Lok Yang Way carries a 30-year tenure and is expected to be completed in 36 months.
JTC has awarded the tender for a 28,441.3 square metre (sq.m.) purpose-built dormitory site at Lok Yang Way.
In a statement, JTC said the tender was awarded to Westlite Dormitory (SII) Pte. Ltd. at a tendered sum of $221.67m.
The site area, which has a tenure of 30 years, is a 28,441.3 sq.m. property with a maximum bed space of 5,000.
The project is expected to be completed in 36 months.