A level, well-prepared surface is what keeps tiles flat and prevents hollow spots from developing. Cement screeding evens out the substrate before tiling, so the finished floor is true and the tiles stay bonded. HMS provides cement screeding in Singapore as part of tiling projects or as a separate preparation service. Screeding matters because tiles are only as good as the surface beneath them. If the concrete slab is uneven, a tile laid on it will sit at an angle, and the adhesive will be thicker in some places than others. Where the adhesive is too thin, the tile develops hollow spots; where it is too thick, it may crack. A poor original screed is a common cause of uneven floors. The screed may have been mixed too wet or too dry, applied unevenly, or laid over a contaminated surface. Over time it can also break down — crumbling, dusting or lifting away from the slab, taking the tiles with it. Moisture affects screed as well. If water is trapped beneath the surface, it can weaken the screed from below and cause tiles to lift. The screed also needs enough time to cure before tiling; tiling too early traps moisture and leads to problems later. HDB and BTO flats, condominiums, landed properties and commercial spaces. Screeding applies to floors in living areas, bedrooms, kitchens and balconies. Every project is assessed individually based on its condition, area and required preparation. HMS provides a written quotation after assessment. A layer of cement-based material applied to the concrete slab to create a level, even surface for tiling. Yes — the published BTO tiling packages include the supply of all necessary cement screed. See BTO Renovation Packages for details. Screed typically needs about a week to cure before tiling. We factor this into the schedule and confirm the timeline at assessment. Yes — for dry-area flooring HDB requires pre-packed screed, and we comply with this requirement. Yes, within the normal thickness range for screed. Significant level differences may need a different approach — we advise on site. Overlay requires a level, sound base. If the existing floor is level, additional screeding may not be needed. Wall tiling generally uses adhesive and levelling rather than screed. We advise based on the condition of the walls. If you are planning to tile and want the floor prepared properly, WhatsApp us your floor plan or book a site assessment for a written quotation.
Cement Screeding in Singapore



When This Service Is Needed
What Causes The Problem
How HMS Handles It
Options
Areas And Property Types
Pricing
Why Choose HMS
Frequently Asked Questions
What is cement screeding?
Is screeding included in your BTO packages?
How long does screed take to dry?
Do you follow HDB screed requirements?
Can screeding fix uneven floors?
Do I need screeding before overlay?
Do you screed walls too?
Related Services
Request an Assessment
HMS Tiling Singapore
HDB-Registered ContractorLicence HB-02-5076Z
12-MonthWorkmanship Warranty
10+ YearsIn Singapore
Direct ContractorNo Middlemen
Clear quotations