The Only Official HMS Tiling Site
Contact us for a quotation now

Cement Screeding Singapore

Fresh cement screed being levelled across a Singapore apartment floor
HMS Tiling Singapore

Cement Screeding in Singapore

A level, well-prepared surface is what keeps tiles flat and prevents hollow spots from developing. Cement screeding evens out the substrate before tiling, so the finished floor is true and the tiles stay bonded. HMS provides cement screeding in Singapore as part of tiling projects or as a separate preparation service.

HDB-Registered ContractorLicence HB-02-5076Z
12-MonthWorkmanship Warranty
10+ YearsIn Singapore
Direct ContractorNo Middlemen
WHEN THIS SERVICE IS NEEDED

When This Service Is Needed

  • The concrete floor is uneven or slopes noticeably.
  • You are re-tiling and the old screed is damaged or crumbling.
  • New tiles are going in and you want to prevent hollow tiles.
  • You need to raise a floor level to match an adjoining area.
  • A previous floor had recurring tile problems — the screed may be the cause.
WHAT CAUSES THE PROBLEM

What Causes The Problem

Screeding matters because tiles are only as good as the surface beneath them. If the concrete slab is uneven, a tile laid on it will sit at an angle, and the adhesive will be thicker in some places than others. Where the adhesive is too thin, the tile develops hollow spots; where it is too thick, it may crack.

A poor original screed is a common cause of uneven floors. The screed may have been mixed too wet or too dry, applied unevenly, or laid over a contaminated surface. Over time it can also break down — crumbling, dusting or lifting away from the slab, taking the tiles with it.

Moisture affects screed as well. If water is trapped beneath the surface, it can weaken the screed from below and cause tiles to lift. The screed also needs enough time to cure before tiling; tiling too early traps moisture and leads to problems later.

Our working method

How HMS Handles It

  • Inspection. We check the level and condition of the floor before recommending a screeding approach.
  • Diagnosis and recommendation. We confirm the screed thickness needed and whether the old screed must be removed first.
  • Surface preparation. The floor is cleaned, primed and prepared for the new screed.
  • Screeding. The screed is mixed and applied to the correct level and left to cure — typically about a week for cement screed — before tiling.
  • Tiling and handover. Once the screed is ready, tiles are laid, grouted, cleaned and handed over.
  • Workmanship warranty. The work is covered by a 12-month workmanship warranty.
  • OPTIONS

    Options

    • Screed and tile as one job. Recommended when you are re-tiling — the same team prepares the floor and completes the tiling.
    • Screeding only. If you already have a tiler, we can prepare the floor for them.
    • Patch screeding. For localised uneven areas, we can repair the affected sections rather than re-screeding the whole floor.
    • Self-levelling compound. For minor unevenness, a self-levelling compound may be sufficient instead of a full screed. We recommend based on the floor condition.
    AREAS AND PROPERTY TYPES

    Areas And Property Types

    HDB and BTO flats, condominiums, landed properties and commercial spaces. Screeding applies to floors in living areas, bedrooms, kitchens and balconies.

    Clear quotations

    Pricing

    Every project is assessed individually based on its condition, area and required preparation. HMS provides a written quotation after assessment.

    WHY CHOOSE HMS

    Why Choose HMS

    • Screeding and tiling are done by the same team, so the floor is prepared and finished correctly.
    • Proper screeding prevents hollow tiles and uneven floors.
    • We confirm the condition of the old screed before recommending a fix.
    • 12-month workmanship warranty on the work.
    Common questions

    Frequently Asked Questions

    What is cement screeding?

    A layer of cement-based material applied to the concrete slab to create a level, even surface for tiling.

    Is screeding included in your BTO packages?

    Yes — the published BTO tiling packages include the supply of all necessary cement screed. See BTO Renovation Packages for details.

    How long does screed take to dry?

    Screed typically needs about a week to cure before tiling. We factor this into the schedule and confirm the timeline at assessment.

    Do you follow HDB screed requirements?

    Yes — for dry-area flooring HDB requires pre-packed screed, and we comply with this requirement.

    Can screeding fix uneven floors?

    Yes, within the normal thickness range for screed. Significant level differences may need a different approach — we advise on site.

    Do I need screeding before overlay?

    Overlay requires a level, sound base. If the existing floor is level, additional screeding may not be needed.

    Do you screed walls too?

    Wall tiling generally uses adhesive and levelling rather than screed. We advise based on the condition of the walls.

    Explore HMS services

    Related Services

    Speak with our team

    Request an Assessment

    If you are planning to tile and want the floor prepared properly, WhatsApp us your floor plan or book a site assessment for a written quotation.